Fire-tubeTANSU steam boilerson solid fuel

300–2000 kg/h · up to 25 bar · hard coal and lignite

Full-cycle manufacturing — from incoming steel to the finished product.

Certified to TR CU 032/2013

Technical data
TANSU solid-fuel steam boiler — front view
On the market
31 years · since 1995
Supplied
2000+boilers
Export
to EAEU and CIS
Compliance
EAC — Eurasian Conformity *
*We are inside a single customs area — which means no import duties exist at all. There is likewise no need for customs declaration and clearance, which speeds up and simplifies buying a steam boiler.
Scope of supply

The boiler is supplied as a complete package

TANSU supplies the steam boiler in the configuration needed for the equipment to work efficiently. The components come from carefully selected manufacturers whose quality has been proven by thirty years of practice.

TANSU solid-fuel steam boiler, complete: boiler, pump unit and water treatment

Boiler water TDS control & automatic sludge blowdown

Spirax Sarco

Automatic surface and bottom blowdown — Spirax Sarco, the leader of the steam and condensate systems industry. All Spirax Sarco components for boilers, boiler houses and industrial plants can be supplied.

Optional

Deaerator · condensate tank

We build them for your production duties — with automatic or manual control.

Freedom of choice

Any components — to your preference

Thanks to long-standing relationships with manufacturers we will supply any components you are used to — a burner of your usual brand, for example. The standard scope of supply does not limit your choice.

Calculated to the Soviet engineering school, European in design. The boiler is clad in polymer-coated steel sheet and comes with flanges for the counter connections.
Shut-off valves — Ayvaz (Turkey); safety valves — ARI-Armaturen (Germany).
Water leaving the deaerator does not need cooling; operation on hot condensate is permitted.
Electrodes, relays and control units.
The forced-draught fan supplies air and sustains combustion inside the boiler.
With an operator panel — depending on the customer's duties and preferences.
Following a set program the system performs backwash and regeneration on its own, without human involvement, and keeps the boiler plant supplied with water without a shutdown.
Automatic surface and bottom blowdown — Spirax Sarco, the leader of the steam and condensate systems industry. All Spirax Sarco components for boilers, boiler houses and industrial plants can be supplied.
We build them for your production duties — with automatic or manual control.
Thanks to long-standing relationships with manufacturers we will supply any components you are used to — a burner of your usual brand, for example. The standard scope of supply does not limit your choice.
Document package

TR CU 032 certificate · Boiler passport · Operating manual with diagrams · Steel certificates · Seamless tube certificates · Independent laboratory report on the welded joints · Strength calculation.

Warranty and support

You are not left alone with the equipment

36 months — boiler shell
12 months — mounted equipment
Warranty
One of the longest warranty periods in the industry.
20 years
of continuous operation
Service life
Design service life of the boiler shell.
Service on call
assembly check and initial commissioning
Site visit
Our specialists come to the site: they check the quality of the equipment assembly and carry out the initial commissioning.
In one language
directly with the plant's engineers
Online consultations
You settle technical questions directly with the engineers who designed this equipment — quickly and without a language barrier.
Design and advantages

Fire-tube three-pass design

In the TANSU fire-tube steam boiler the hot combustion products travel inside the smoke tubes, washed by water on every side, and give up their heat through the tube walls. Across three gas passes we reach the maximum heat recovery: efficiency up to 80 % on solid fuel. Every TANSU steam boiler is built to this scheme.

80%

Dependable efficiency

The three-pass scheme gives up to 80 % efficiency on solid fuel — a high figure for coal-fired boilers.

Large water volume

The water reserve in the shell holds steam pressure steady even under sharp peak loads.

Resistance to water chemistry upsets

Unlike European fire-tube counterparts, TANSU boilers are more tolerant of water chemistry regime upsets: a deviation in water treatment does not damage the boiler immediately and allows it to run for some time until the fault is corrected. This is a very significant operational advantage.

Runs without an induced-draught fan

There is no power-hungry induced-draught fan — so no constant load on the electrical supply and no extra operating costs.

Simplicity and reliability

A monoblock steel construction with natural circulation: simple to service and long-lived.

Technical data

The steam boiler range

The standard sizes are 500, 1000 and 2000 kg of steam per hour. Select a model to highlight its parameters. Boilers of other capacities and of intermediate outputs are built to order — the configuration is defined by the questionnaire.

Selected model
Useful heat output
Steam output
Pressure
Dimensions, mm
Selected model
E-1.0-0.9
RN · 3-pass furnace
Useful heat output
670 kW
Steam output
1,000 kg/h
Pressure
8 bar
Dimensions, mm
3,680×1,940×2,185
Model E-0.5-0.9RN E-1.0-0.9RN E-2.0-0.9RN
Steam outputkg/h5001,0002,000
Useful heat outputkW3356701,350
Efficiency at nominal output%808080
Steam working pressurebar888
Steam temperature°C175175175
Furnace inner diametermm7708401,000
Furnace length with the reversal chambermm2,5002,8003,600
Furnace type3-pass3-pass3-pass
Aerodynamic resistancembar2.02.56
Flue diametermm300400600
Steam line connection diametermm656580
Weight without waterkg3,3504,9008,200
Boiler water volume2.33.376.1
Boiler steam volume0.5631.061.46
Dimensions, mm
Lengthmm3,3303,6804,600
Widthmm1,7401,9402,220
Heightmm1,9802,1852,495

* All parameters are given for the nominal duty. 3-pass — straight-through (three-pass) furnace. Weight, volumes and dimensions are for reference; the final scope of supply is confirmed by the questionnaire.

Download the technical data — TD-02 · PDF

What sets us apart

Quality verified at every stage

In-house inspection — QC department

Our own technical control department checks every operation — from incoming steel inspection to final testing. The QC department reports directly to the head of the company.

External independent inspection

Raw material and welds are checked by an independent laboratory: visual and measuring inspection (VT) reveals surface defects, ultrasonic testing (UT) — hidden defects inside the weld.

Full-cycle manufacturing

From steel cutting to hydraulic testing of the equipment at our own production base — full control of every operation.

Certification

The equipment is manufactured in strict accordance with TR CU 032. Inspection control is carried out annually, with independent specialists attending.

Corporate video · TANSU manufacturing
TANSU corporate video — steam boiler manufacturing
YouTube · 16:9 Quality control, laboratory inspection and the full manufacturing cycle — in one film about the plant.

Plant tour — Russian narration; English subtitles available via CC.

Applications

Where process steam works

TANSU steam boilers work wherever steam is part of the process.

Dairy plants — pasteurisation, sterilisation and CIP cleaning
Bakeries and confectioneries — proofing and oven humidification
Breweries, distilleries and beverages — brewing and container sterilisation
Meat processing — thermal chambers and sterilisation
Oil refining and tank farms — tank heating
Bitumen and asphalt concrete plants — bitumen heating
Aerated concrete and precast concrete plants — steam curing chambers and autoclaves
Paper and corrugated board plants — drying and pressing
Plastics processing — moulding and heat stabilisation
Pharmaceuticals — clean steam, sterilisation and autoclaving
Textiles and laundries — ironing, steaming, washing
Agriculture and greenhouses — feed production, heating and soil steaming

…and any other production where process steam is required — the boiler is selected for the duty from the questionnaire.

TANSU solid-fuel steam boiler in the customer's boiler house
TANSU solid-fuel steam boiler in the customer's boiler house
Want to see more photographs — go to the gallery →
Clients

Manufacturers trust us

TANSU is an export-oriented plant: deliveries go to every CIS country, above all Kazakhstan and Russia. In 31 years of work more than 2000 boilers have been built for enterprises in the food, oil and gas, paper, construction and other industries. Below are some of the customers of recent years.

Coca Cola Uzbekiston
UzCarlsberg
Infaprim
Shoro
QBP
UNU
RzhD
Interrin
NKBK
Capital
APK
CPL
KG
Zhayik-Et
ETPlus
AZALA
Ailana
AksaiNan
Akun
Alatau-Kus
AN
Arpa
Bizhan
BM
DEP
EF
Elsyor
Emilia
EPA
EPF
FDC
GlobusPlus
GMZ
Kirbi
Kolos
Koshoi
KZ
Lagi
MD
Mibeko
Molbid
MolIstorii
Natige
Nuristan
Ordabasy-Kus
PCDG
Pulsar
PvdBr
Rix
Rola
Saule
Shapovo
Sonun
TKG
TM
TomatKG
Trapeza
Vivid
Zh
ABT
Azhiidar
IMS
Kutu
Suv
Bent
KTSP
TB
TE
AI
HTS
KapS
KMZ
KONSEL
Lina
MailuSuu
Med
Med2
Radix
RO
SDK
SMP95
TMZ
Torext
TWI
YuZMS
AGPZ
Bioprom
EO
KPK
MOR
AF
Aktau
Demeu
ET
KTI
Certification and trust

Verified conformity at every stage

The products are certified and undergo annual independent inspection control. That guarantees consistent quality from batch to batch.

TR CU

TR CU 032/2013

“On the safety of equipment operating under excess pressure”. The boilers are manufactured in strict accordance with the regulation and undergo annual independent inspection control.

No. EAEU RU C-KG.MO09.V.00869/25
Validity 15.04.2025 — 14.04.2030
Type TANSU steam fire-tube boilers, type E
Design life design service life 20 years · 100,000 h
↳ annual inspection control
Enlarge EAEU TR CU 032 certificate of conformity — TANSU steam boilers EAEU certificate of conformity · TR CU 032

Certificate of Conformity TR CU 032/2013 — official document (Russian)

Materials

Catalogue, photographs and video

Questionnaire

We will select a boiler for your site

Fill in the short form — that is enough for a quick estimate. Need an exact calculation and a quotation? Expand the full questionnaire.

Short questionnaire
Provide at least one contact field — phone or email.
SECTION 1

Site and steam parameters

SECTION 2

Condensate

SECTION 3

Additional equipment

Deaerator
Condensate return tank
Water treatment (WTP)If you have a water analysis — attach the file
Automatic blowdown
Modulating boiler water level
PLC (programmable controller)
SECTION 4

Notes and additional requirements

A specialist replies within one business day
News

Shipments and events